首件防撞墙施工后,防撞墙混凝土顶面出现了较多的微小裂缝现象,经过分析研究,项目部对防撞墙及波形护栏基础分三次进行收面,混凝土初凝前使用铁摸进行最后一遍压光收面处理,通过收面愈合之前混凝土表层产生的塑性裂缝,收面完成后,混凝土顶面及时覆盖一层塑料薄膜,并对混凝土顶面湿水养护,波型护栏基础混凝土收面时,因
纤维 驱鸟设备 保定通风管道 塑料土工格栅 检查井模具 流水槽模具 锻造厂家 华尔街铜牛工作量较大,收面时间较长,现场在波型护栏基础混凝土顶面以上40cm高度搭设了一道土工布,以减小波型护栏基础混凝土表面温度及风速,减小顶面裂缝现象。通过工艺改进,防撞墙顶面裂缝现象显著减少,混凝土表观质量得到有效控制。
After the construction of the first anti-collision wall, there are many
small cracks on the top of the concrete of the anti-collision wall.
Through analysis and research, the project department has finished the
anti-collision wall and the wavy fence foundation three times. The
concrete is treated with the iron touch for the last pressing finish
before the initial setting, and the plasticity produced in the concrete
surface before the surface is healed. When the surface of concrete is
closed, a layer of plastic film is covered on the top of the concrete in
time, and the wet water curing of the top of the concrete is carried
out. When the concrete of the wave-shaped guardrail foundation is
closed, a geotextile is laid at the height of 40 cm above the top of the
concrete of the wave-shaped guardrail foundation in order to reduce the
wave-shaped protection. The surface temperature and wind speed of the
concrete are reduced to reduce the cracks on the top surface. The cracks
on the top of the anti-collision wall have been significantly reduced
and the apparent quality of concrete has been effectively controlled by
technological improvement